Guideline: Tips - Analyze The Product Risks (AST) |
|
Relationships
Main Description
-
A point to note is that the PRA session, if relevant, may be combined with (a part of) the subsequent activity,
‘Determining the test strategy’.
-
With a PRA for a test level, the challenge is to allow the test goals, characteristics and object parts to relate
only to the scope of the test level. It is meaningless to recognise security as a big risk if this characteristic
has already been assigned to another test level from within the master test plan.
|
Copyright
© 2006, Sogeti Nederland B.V. All rights
reserved.
|
|